rhyton-erp-azar-oil-field-6

Azar Oil Field Development

Project Size

  • US$ 1.6 billion
  • 11 Sub-Contractors
  • 920 Engineers

“Rhyton approach included continually providing us with an excellent solution which offers more customization, flexibility and ease of use than most off the shelf Software currently available within the marketplace.”

S. Asnaf, Chief Information Officer, SAED Co.

Project Detail

Sarvak Azar Engineering and Development (SAED) Company incorporated in 2012 for development of Azar Oil Field.

The giant Azar oil field is located in Anaran exploration block in Iran/Iraq border that based on comprehensive geological studies, contains 2.44 billion barrels of light oil in place.

First production from the field was achieved in March 2017 and early production of 30,000 Barrels Of Oil Per Day (BOPD) was achieved in April, 2017.

The development plant involves drilling of 18 wells at the depth of 4.700 meters and the field expected to produce 65,000 barrels of oil per day upon achieving full production.

A 63 km-long, 6 in-diameter pipeline was built from the production facility to connect to the main oil transport pipeline.

A further 130 km-long, 16 in-diameter pipeline was constructed to transport sour gas to the production facility.

The project includes basic and detailed engineering, procurement of equipment and materials, and construction.

Over 10 construction and drilling sub-contractors were active in this project.

Challenges

  • Impassable access to the project;
  • Weak internet infrastructure;
  • Massive paper documents;

Sub-Systems

Start typing and press Enter to search